Water Rate

 Effective: October 1, 2019 

 

Section 62-291 Consumption Charges

 

Bi-Monthly Potable Water Service Charge

 

 Meter  October 1, 2019  January 1, 2020  January 1, 2021 January 1, 2022 January 1, 2023
 5/8" $41.29  $45.52  $50.19  $55.33  $59.21 
3/4"  $60.92    $67.17   $74.05  $81.64  $87.35 
1" $100.18  $110.45  $121.77  $134.25  $143.65 
1-1/2 " $198.33  $218.65  $241.07  $265.77  $284.38 
2" $316.10  $348.50  $384.22  $423.60  $453.26 
3" $590.91  $651.48  $718.25  $791.87  $847.31 
4" $983.49  $1,084.30  $1,195.44  $1,317.97  $1,410.23 
6" $1,964.95  $2,166.36  $2,388.41  $2,633.22  $2,817.55 
8" $3,142.70  $3,464.83  $3,819.97  $4,211.52  $4,506.33 
10" $4,516.75  $4,979.71  $5,490.13  $6,052.87  $6,476.57 

 

 Consumption rates for Single-Family Residential, Multi-Family, Commercial, Industrial, and Government, etc.

 

Potable Water Commodity Rate Structure

 

 Water User October 1, 2019 January 1, 2020 January 1, 2021 January 1, 2022 January 1, 2023
 Domestic Cost per CCF  Cost per CCF  Cost per CCF  Cost per CCF  Cost per CCF 
1-13 Units $1.77  $1.95  $2.15  $2.37  $2.54 
14-35 Units $2.24  $2.47  $2.72  $3.00  $3.21 
36 Units and
Over
$2.36  $2.60  $2.87  $3.16  $3.38 
 Irrigation     
1-13 Units $1.88  $2.07  $2.28  $2.51  $2.69 
13-35 Units $2.60  $2.87  $3.16  $3.48  $3.72 
36 Units and
Over
$2.65  $2.92  $3.22  $3.55  $3.80 

 

Section 62-293 Private Fire Services

 

Certain properties in the City have a private fire service meter installed. Properties with such meters installed will be required to pay the bi-monthly fire service rate, which is determined based on the size of the fire meter serving the property.

 

Fire Service Rates

 

 Size August 1, 2019 January 1, 2020 January 1, 2021 January 1, 2022 January 1, 2023
2" or less  $8.64  $9.53  $10.50  $11.58  $12.39 
       3" $25.10  $27.67  $30.51  $33.63  $35.99 
       4" $53.48  $58.96  $65.01  $71.67  $76.69 
       6" $155.36  $171.28  $188.84  $208.19  $222.76 
       8" $331.07  $365.00  $402.41  $433.66  $474.72 
      10" $595.37  $656.40  $723.68   $797.86  $853.71 
      12" $961.69  $1,060.26  $1,168.94  $1,288.76  $1,378.97 

 

Section 62-297 Temporary Service for Contractors

 

Lost, stolen or damaged meter - the Contractor will be responsible for repair and/or replacement cost, as determined by the City

 

Bi-Monthly Temporary Construction Water Service Charge (Potable Water)

 

Meter October 2, 2019 January 1, 2020 January 1, 2021 January 1, 2022 January 1, 2023
   1" $100.18  $110.45  $121.77  $134.25  $143.65 
   3" $590.91  $651.48  $718.25  $791.87  $847.31 

 

Temporary Construction Water Commodity Rate Structure (Potable Water)

 

Water Use   October 2, 2019   January 1, 2020   January 1, 2021   January 1, 2022   January 1, 2023t
Tiers            Cost Per CCF      Cost Per CCF    Cost Per CCF    Cost Per CCF    Cost Per CCF
   1  1-13 Units $1.77  $1.95 $2.15  $2.37  $ 2.54 
   2  14-35 Units  $2.24  $2.47  $2.72  $3.00  $3.21 
   3  36 Units and
 Over
$2.36  $2.60  $2.87  $3.16  $3.38 
   4  Imported
 Water
 Conservation
 Charge
$ -  $ -  $ -  $ -  $ - 

 

Bi-Monthly Temporary Construction Water Service Charge (Recycled Water)

 

   Meter  October 2, 2019  January 1, 2020  January 1, 2021  January 1, 2022  January 1, 2023
     1" $20.04   $22.09  $24.35  $26.85  $28.73 
     3" $118.18  $130.30  $143.65  $158.37  $169.46 

 

Temporary Construction Water Commodity Rate Structure (Recycled Water)

 

 Water Use  October 1, 2019  January 1, 2020  January 1, 2021  January 1, 2022  January 1, 2023
      Cost per CCF    Cost per CCF     Cost per CCF    Cost per CCF    Cost per CCF
 CCF Units $1.30   $1.35  $1.26  $1.30  $1.35 

 

Contractors shall provide a refundable deposit for construction meters at the rates shown below. Additionally, the City shall collect an advanced payment equal to the rate of a single bi-monthly service charge at the requested meter size and type of water to be utilized and 55 CCF at the then current rate, said deposit and advance payment is to guarantee payment for all water used and return of the meter. Lost, stolen, or damaged meters are the responsibility of the contractor and will be repaired or replaced at the determination of the City.

 

Deposit Amount:

 

 1 Inch Meter $288.00 
 3 Inch Meter $1,030.00 

 

All water charges subject to the adjusted fee schedule will resume Annual CPI adjustment, as outlined in City Code Section 62-271, starting on January 2, 2024.

 

Section 62-299.  Due Date; Disconnection Fee and Delinquency Charge

 

 Delinquency Charge (20 days after bill has been issued) 5% 
 48 hour Notification Charge  $39.14 
 Disconnect Order 
 This charge is applied even if meter is not physically turned-off.
 Daily Turn-off (City Hall Business Hours and 5:00 p.m.) $42.28 
 Restoration Order
 Daily Turn-off (City Hall Business Hours and 5:00 p.m.) $42.28 
 Service Call
 After Hours, Weekends, and Holidays $81.49 

 

 Section 62-321. New Connection Charges (System Buy-In Fee)

 

 Based on Meter Size  
 5/8" $ 2,981.03 
 3/4" $ 4,471.57 
 1" $ 7,452.70 
 1-1/2" $ 14,905.50 
 2" $ 23,848.87 
 3" $ 47,697.84 
 4" $ 74,527.95 
 6" $ 149,055.98 
 8" $ 238,489.62 
 10"  $ 342,828.87 

 

 Section 62-322. Connection Charges - Main Extension Charges

 

 Per Front Foot $ 80.94 

 

 Division 3. Continuity of Utility Services Program - Rental Properties

 

 Section 62-263. Continuity of Utility Service Program Charges

 

 (Charges are for owners/authorized agents)
 Rental Properties Program Administrative Fees
 Program Master Account Set-up Fee  $ 27.49 
 Program Account Transfer Fee  $ 4.56 
 Program Account Modification Fee $ 4.56 

 

 Division 2. Connections and Establishment of Service

 

 Section 62-241. Application for Connection

 

 (Charges are for new service) 
 Daily Set-up fee (City Hall Business Hours) Non-refundable $ 56.35 
 Weekends (after hours, weekends & holidays) $ 97.19 

 

 Section 62.242. Charges

 (Charges are for new construction and meter upgrades)

 Charges for meter downgrades are based on actual expenses for work performed.

 

 

 Service Size (Installation)
 1" $ 5,325.88  
 1-1/2" $ 7,161.82 
 2" $ 7,814.71 
 Meter Size (Meter Setting)
 5/8" x 3/4" $ 992.32 
 1" $ 1,430.50 
 1-1/2" $ 2,642.04 
 2" $ 3,196.34 
 Minimum Charge for Meter/Service Installation Outside City Limits $ 4,660.06 

 

 Section 62-243. Advance Payment Required

 

 

 Minimum $ 167.78 
 Maximum  $ 6,248.06 
 Payment by Meter Size 
  Residential 
 Meter Size
 5/8" $ 167.78 
 3/4" $ 167.78 
 1" $ 200.10 
 1 1/2" $ 256.63 
 2" $ 301.80 
 3" $ 403.53 
  Commercial
 Meter Size
 5/8" $ 256.63 
 3/4" $ 256.63 
 1" $ 332.51 
 1 1/2" $ 403.53 
 2" $ 508.46 
 3" $ 711.91 
 4" $ 897.57 
 6" $ 1,509.46 
 8"  $ 2,019.67 
 10" $ 2,531.45 
  Irrigation
 Meter Size
 5/8" $ 301.80 
 3/4" $ 301.80 
 1" $ 403.53 
 1 1/2" $ 610.20 
 2" $ 813.64 
 3" $ 1,222.09 
  Fire lines
 Meter Size
 2" $ 167.78 
 3" $ 256.63 
 4" $ 356.70 
 6" $ 665.09 
 8" $ 960.53 
 10" $ 1,268.87 
 12" $ 1,509.46 
  Fire Hydrant Meters
 Meter Size
 1" $ 484.22 
 3" $ 1,614.41 

 

 Section 62-244. Advance Payment by Non-resident Consumer

 

 Minimum $ 167.78 
 Maximum $ 6,248.06 

 

 Section 62-248. Private Fire Protection

 Unauthorized Use of Fire Protection Service

 

 Per Incident $ 604.54 

 

 Division 1. Generally

 Section 62-195 Recycled Water Rates

 

The City supplies recycled water treated by the Los Angeles County Sanitation District at their Pomona wastewater treatment plant. This recycled water is delivered to the City where it is stored in an above ground water storage reservoir and delivered to City customers upon demanded. The City’s recycled water system includes three non-potable water wells within the Spadra Basin, two reservoirs, six booster pumps, two pressure zones and two transmission lines. Recycled water service charges pay for the costs of operation and maintenance of these facilities, capital improvements, and as well as recycled water supply costs.

 

Bimonthly Recycled Water Service Charge

 Meter  August 1, 2019  January 1, 2020  January 1, 2021 January 1, 2022  January 1, 2023
2" $ 63.22  $ 69.70  $ 76.84  $ 84.72  $ 90.65 
3" $ 118.18  $ 130.30  $ 143.65  $ 158.37  $ 169.46 
4" $ 196.70  $ 216.86  $ 239.09  $ 263.59  $ 282.05 
6" $ 392.99  $ 433.27  $ 477.68  $ 526.64  $ 563.51 
8" $ 628.54  $ 692.97  $ 763.99  $ 842.30  $ 901.27 
10" $ 903.35  $ 995.94  $ 1,098.03  $ 1, 210.57  $ 1,295.31 
12" $ 1,963.33  $ 2,164.57  $ 2,386.43  $ 2, 631.04  $ 2,815.22 
14" $ 2,944.78  $ 3,246.62  $ 3,579.40  $ 3,946.29  $ 4,222.53 
16" $ 3,926.24  $ 4,328.68  $ 4,777.37  $ 5,261.54  $ 5,629.85 
18" $ 4,907.70  $ 5,410.74  $ 5,965.34  $ 6,576.79  $ 7,037.17 

 

Recycled Water commodity Rate Structure

 

August 1, 2019 January 1, 2020 January 1, 2021 January 1, 2022 January 1, 2023
$ 566.47  $ 589.42  $ 546.92  $ 566.55  $ 587.74 

 

 Section 62-208. Tampering with Meter

 

 Missing and/or Broken Lock $ 21.89 
 Meter and/or Jumper Pull $ 163.08 
 Valve Damage and/or Tampering $ 356.05 

 

 Sewer Rate

 Section 62.400. Sewer Service Charge

 

                      August 1, 2019 January 1, 2020 January 1, 2021 January 1, 2022 January 1, 2023
 Bi-Monthly Service Charge $ 9.39  $ 9.96  $ 10.56  $11.19  $ 11.75 
 Rate Per Unit of Consumption $ 0.07  $ 0.74  $ 0.78  $ 0.83  $ 0.87 

 

 Solid Waste

 

 Section 62-672. Established (Rates and Charges)

 

  Basic Rate $ 60.61 